Dakotagrafx 7,297 Posted August 31, 2016 Usually I am known for getting work out very fast but till mid to later sept we will have extended lead times more likely a week as the house to torn up waiting for new carpet (where design computer sits - although set up in another area it is like working with one hand tied behind your back) and wife is having foot surgery friday and the other foot 2 weeks later that will leave her totally dependent on me for everything . . . . . so waits will be incurred during this time - will still do my best to get stuff out but I am positive there will be more delays than normal 1 Share this post Link to post Share on other sites
Go-C Graphics 856 Posted August 31, 2016 I know the feeling. I'm laying tile this weekend in the same room I build and tape all my graphics. It's just not the same in a different room and takes alot longer. Hope everything with your wife goes OK. I'll be think about you guys in my prayers. 1 Share this post Link to post Share on other sites
hhsg 43 Posted September 1, 2016 I have the same issues. On is that the shop going to be close for a little time away and a new floor and walls get rid of the old plaster Share this post Link to post Share on other sites